
Figeac Aero Success story
Discover how Figeac Aero has reduced inspection time for a 12-meters wing spar from 20 hours to 5, what is their latest 3D metrology engineering project that led to 24/7 98% use rate of their Hexagon CMM and more.
Discover how Figeac Aero has reduced inspection time for a 12-meters wing spar from 20 hours to 5, what is their latest 3D metrology engineering project that led to 24/7 98% use rate of their Hexagon CMM and more.
3D measurement by CMM: 4 times faster inspection at Figeac Aero using Silma and Metrolog X4! A leader in aeronautical subcontracting, Figeac Aero is involved in almost all ongoing civil aeronautical programs. The company has been continuously growing since it was founded in 1989…
Did you know that back in 2010 Metrologic Group was the first to develop and then market a robotic inspection technology? We created breakthrough value that resonated…
Metrologic Group estará en MetalMadrid los dÃas 27 y 28 de Noviembre. MetalMadrid es la feria lÃder en innovación industrial que cada año, presenta los últimos adelantos y novedades para…
Visit our partner, Solutions for Metrology, booth 1.A07 at the MOLDPLAS show in Batalha, Portugal, till November 9.